leveling; maximum deviation

402 views 5 replies
Reply to Topic
xiao1236

Age: 2023
Total Posts: 7017
Points: 10

Location:
,
sheet paste should be sub-section from top to bottom horizontal along the horizontal pavement, each row of board should be wrong slot 1/2 board length, the local minimum of not less than 100 wrong slot. 5, the installation of fixed parts: (1) fixed pieces in the extruded plate after 8 hours to start the installation, and within 24 hours after the completion. According to the design requirements of the location of the hole with a percussion drill, hole 10, into the grassroots wall depth of about 60, fixed anchor into the grassroots wall depth of about 50, to ensure solid and reliable. (2) the number of fixtures required by the design instructions set. (3) self-tapping screws should be squeezed tightly and the plastic expansion screw cap and extrusion board surface neat or slightly screwed in to ensure that the tail nail screwed back to the grassroots wall fully anchored. Grinding: (1) Uneven joints of the extruded board shall be ground with coarse sandpaper. The movement shall be a gentle circular motion. Do not polish along the direction parallel to the joint of the extruded board. (2) Extruded board scraps and floating dusts should be cleaned with a brush after grinding. 7, for decorative angle: (1) According to the design requirements with ink pop-up need to do the position pvc wood powder door in india
decorative plastic garden wall blocks
installing wooden fence on concrete wall
Posted 08 Mar 2018

Posted 31 Mar 2018

Posted 15 Sep 2018

Posted 16 Oct 2018

Posted 04 Nov 2018

Posted 16 Nov 2018

Reply to Topic