Wood dehumidification folk small recipe

59 views 0 replies
Reply to Topic
xiao1236

Age: 2023
Total Posts: 7017
Points: 10

Location:
,
When using geothermal flooring, consumers must pay attention to the gradual heating of floors and floors. When installed, the surface temperature should be maintained at about 18 ??. Before installation, the concrete floor temperature should be gradually increased by 5 ?? daily until it reaches about 18 ?? so far.In the first 3 days after the installation is completed, the temperature should be maintained for 3 days before it can be warmed up as needed, and the temperature can only be raised by 5 ?? per day. First use of geothermal heating, attention should be slowly warming. For the first time, the first three days of heating should be gradually warmed: the first day the water temperature is 18 ??, the next day 25 ??, the third day 30 ??, the fourth day can rise to the normal temperature, the water temperature 45 ??, the surface temperature 28 ?? ~ 30 ??. Can not heat up too fast, too fast, the floor may be due to swell cracking phenomenon. When geothermal heating system is activated for a long time, it should be heated up strictly according to the heating program as the first time."good quality white polymer outdoor tables and benches,spa surround composite in Finland,shaw vinyl flooring reviews "
Posted 07 Jun 2018

Reply to Topic