the inspection of ultrafine mill

445 views 1 replies
Reply to Topic
kmei4545

Age: 2023
Total Posts: 0
Points: 10

Location:
,
In order to reduce the breakdown of ultrafine mill in the production process, the newly purchased equipment will be commissioned after the installation is completed. This can check the equipment itself and the possible faults in the installation process. This is the purpose of commissioning. Tell us about the correct operation of the test run.
Followed by the inspection of the ultrafine mill on-load operation, it is to add materials to the equipment, and then to make it run, in this process, in addition to attention to screws, rotors, etc. are loose, there are attention to the boot sequence, to prevent improper boot Due to the damage, the running time of the on-board tester is generally 8 to 12 hours. During the operation, it is necessary to pay attention to whether the bearing and other components are faulty. The shutdown sequence after the operation is completed cannot be wrong.
The article mainly introduces the purpose of the ultrafine mill test run, and then introduces the two phases of the test run. First, the inspection items to pay attention to during the no-load period; second, the check items to pay attention to during the load, these are mainly In order to ensure the smooth progress of the production process.
Posted 08 Jan 2019