First, the floor seam from the country have any provisions Decoration supervision: national standards do have this provision, the floor after laying to acceptance Well. When the acceptance of the provisions of the seam can not be greater than 0.8 mm,
waterproof wood floor install for bathroom if the occupant after the arrival of the warranty period of one year, if the seam from the change, the maximum can not exceed two millimeters. Second, why the floor from the seam. Supervisor: According to my understanding of ah, there may be two factors from the seam. The first factor is the original water content of the floor itself is relatively high. Flooring on the ground after the floor, it changes the water evaporation, caused by the horizontal contraction of the floor from the seam, and that is the material itself, the problem of water content is relatively large.
fences panels with wood grain The second in the manual installation, because the installation of the staff did not understand the situation of the water content of the floor. Then in the installation process between the floor and the floor, he may install a little loose, it will increase the severity of the seam. Third, the installation of the floor should pay attention to what? Supervisor: Our family inside the floor decoration it. Decoration, first of all to get this house, the house inside the humidity is relatively large, the most important of all we must first ensure that the ground dry.
low maintenance interior wpc flooringWhen we mix in the decoration of concrete mortar, will produce moisture. So this one, then we must first keep the ground dry. The second is that we installed the wooden keel with the floor. Wood keel with the best water can be consistent with the floor, relatively consistent on it. So we recommend that the floor before the installation, the best in advance of a couple of days into the house inside the first contact with the air, so you can balance it.
large wooden flower boxes irelandThis is the second thing. The third I think, because the floor during the installation process, it will be more than a certain length of thermal expansion and contraction of the. Therefore, when the width of more than 6 meters in length over 12 meters, we recommend that you must install the partition, to give it some contraction of space. According to the moisture content of the situation we recommend that when the installation must be done. The first to have moisture-proof pad, moisture pad has two roles. One is the buffer between the floor and the keel is not a head-on Well, this way there is damage to the floor. The second, then played the role of the tide, the floor as long as attention to these few, I think the deformation coefficient is relatively small and more.