the floor between

240 views 2 replies
Reply to Topic
xiao1236

Age: 2023
Total Posts: 7017
Points: 10

Location:
,
a regular distribution, the occurrence of a small number Maintenance Free Patio Furniture . Take measures to install the floor, in the tongue and groove side of the nail. Third, the ground is not flat, the ground is not flat, the floor after the pavement, individual parts of the floor and the gap between the ground Composite Decking Installation Cost Singapore , people move the floor up and down the floor between the sides of the friction caused by collapsing side. It is characterized by floor pavement, the collapse occurred in people often move the region Composite Retaining Wall Panels , but also local.
To take measures before the floor pavement must first measure the flatness of the ground Engineered Composite Flooring Netherlands , the flatness should be less than 3mm / 2000mm, do not have the conditions of the ground, should be flat after the pavement.
Posted 24 Jan 2017

Reply to Topic