and expressed willingness to actively handle the matter, and now we have been repaired the wall, and I do not want to hold each other's responsibility, just want to Remind you that the installation of wood flooring should pay attention to avoid the occurrence of pollution of the wall again. "For a similar situation,Mr. Lu said that in the wood floor installation process, saw the floor as far as possible in the outside corridor or balcony, such as ground Has been paved with tiles, marble and other ground materials, should be placed in the saws under the location of the carton to avoid contact with the ground as far as possible.
If the installation area encounters a special situation that is not in place, the tiles or marble are stained with the mineral color and can also be wiped with a diluent. If the wall is attached to the sawdust, the feathers can be cleaned or wiped with a dry cloth, avoid wiping with a wet cloth.Shouguang Chenming plate company took out nearly ten thousand yuan on the 25 rationalization of the proposed followers reward,
Related links:
lowes external outsteel door with half glasswood plastic composite decking manufacturer
want to buy composite deck board cheap