According to statistic, majority of wooden floor problem is by laid undeserved be caused by. Floor installation is proper, great influence is worn the service life of the floor.
Composite Wall Panels Company Chief hints related circumference floor: Installation of real wood floor should keep away from law of 7 kinds of wrong shops. One, the ground did not do make level processing: The the earth's surface is rough can make partial floor and keel impending, noise can be given out when trample. 2, wooden keel is not moistureproof: People often considered the laid of moistureproof mat, but meet sometimes itself of oversight wood keel is dry. Be in normally without dry wooden keel moisture content 25% the left and right sides,
Anti Moisture Floors Trinidad And Tobago and eligible wooden floor moisture content is in commonly 12% , humidity has differred congress to make wooden floor sucks tide quickly, cause blowout of face of the arch since the floor, lacquer.3, too loose or too close: As the change of environmental temperature and humidity, wooden floor can expand or contract.
exterior stair tread wood material Accordingly, when laid floor, the on any account of environmental temperature and humidity that should use a room according to making comes of floor of reasonable arrangement wood spell outfit degree of tightness to spend. If cross a pine, floor systole can appear larger crack, too close, wriggle through the earth can have when the floor expands.4, did not spread moistureproof mat: All the year round, climate difference is bigger, the humidity in air also fantasticality, Real wood floor Most abstain from moisture and damp, because this has done moistureproof work very be necessary.5, secure with Tie Ding: The fixed way that makes chock add Tie Ding is used in construction, can build chock of cause of formation and Tie Ding interface is too small and make the power that grasp a hammer insufficient, cause wooden keel extremely easily to become loose, noise can appear when trample floor.6, the project has across: Apply man-hour to lay good floor first, undertake other construction on the floor next, this is the usual practice that decorates a team at present.
homemade slide gate using a field gate Namibia But such, after floor laid ends, often need to pass a surname on the time ability burnish with a longer even month. During, the hydrosphere of floor and surroundings, chemical did not make any segregation step, bring about wood probably to the floor changes quickly because of moisture content and be out of shape, craze.7, floor direction and the direction that take the door is abhorrent: Must notice floor length direction should keep consistent with the azimuth that take the door when construction, in order to assure favorable visual result.