wood floor of green

185 views 2 replies
Reply to Topic
xiao1236

Age: 2023
Total Posts: 7017
Points: 10

Location:
,
common saying says 3 minutes of 7 minutes of quality, installation, see the value that the floor installs. Construction is decorated in the ground in, the question that laid of real wood ground appears is more.australian composite decking manufacturer As owner, ought to install a method to understand somewhat to real wood floor before construction, with knowing construction schedule in time, ensure floor shop outfit is successful and finishing. Below, chief of market of floor of very beautiful home will introduce the method of 3 kinds of installation that explains real wood floor for everybody, look together. Real wood floor installs 3 laws: One, the straight installation that stick typeMoistureproof cloth + floorApply to: On any account differs the ground that losing 2 ?Apply to: Type of the heat of the earth's interior and type of blame terrestrial heatInstall measure: 1. On the ground of whole foster cordial relations between countries, spread fortify wet cloth to cover whole area first, produce the result in order to achieve moistureproof sound insulation evenly.pvc wall claddings Malaysia The data filling up a layer that is used at the heat of the earth's interior is unfavorable heavy panel, conduct with benefit quantity of heat. 2. Spread on moistureproof cloth multilayer real wood floor. 2, the straight installation that extend patternThick plywood + moistureproof cloth + floorApply to: Apply to ground flatness not to exceed 5MM and the ground of 2 building aboveApply to: Be not type of the heat of the earth's interiorInstall measure: 1. Clear the ground, splint should curium cut do not be more than 600×600 ? norms, between splint and plywood the aperture of ? of obligate 5—10. 2. On splint laid prevents tide or anti-flammability bubble cotton,wood composite terrace china wet cloth of wall frontier defence should over ground 8—10MM, between splint and moistureproof cloth need not stickup. 3. Get on floor shop in moistureproof cloth again, between floor and moistureproof cloth need not stickup, nail 45 degrees of horn in order to do not have a head to urge fixed floor board on fair tenon. 3, wear expensive type installationSpecial wood keel + thick plywood + moistureproof cloth + floorApply to: Apply to ground flatness not to exceed 5MM and the ground of 2 building aboveApply to: Be not type of the heat of the earth's interiorInstall measure: 1. Equipment is very special wooden keel, span is less than between wooden keel be equal to 350 ?, wear a face must level off. 2. Be able to bear or endure on the besmear on wooden keel water adhesive, the splint store that controls ply for 12 ? is on framework, splint should curium cut do not be more than 600×Norms of 600 ?,how to build a deck over a concrete porch between splint and plywood ? of span 5—10, reoccupy air gun infiltrates the hammer that do not have a head be secured on splint and framework. 3. Moistureproof on splint upper berth cloth, go up in moistureproof cloth upper berth again floor, nail in order to do not have a head on fair tenon truly 45 degrees of horn urge fixed floor board.
Posted 15 Jun 2017

Posted 06 Apr 2018

Posted 02 Oct 2018

Reply to Topic