Everyone in the inspection room can be on the floor back and forth, the footsteps should be increased, especially by the wall parts and the door parts and more attention, found that the sound of the parts to be repeated to move to determine the specific location of the sound mark. Beijia floor to remind you that, encountered such a situation, should be required to remove the resurfacing. There are sound parts of the construction workers in the construction process is not standardized and the use of materials caused by failure: the operation is not standardized mainly in the keel fixed is not strong; material failure is mainly reflected in the keel without drying. In addition, some decoration construction units with untreated keel construction, the surface to see the traces of drying, in fact, did not dry.true forest vinyl flooring
More common is because the keel untreated, there are borers. Such as the discovery is not timely, and so found a bite, the floor has been almost the same. Creases and scratches can be seen directly with the naked eye. But for the floor scratches the country has expressly stipulated: solid wood flooring gap should not be greater than 0.5 mm; scratches are mainly caused by rough decoration, such as waxing method can not be repaired, it must be replaced.white woodgrain upvc fence in uk