hall floor production pavement project

101 views 1 replies
Reply to Topic
xiao1236

Age: 2024
Total Posts: 7017
Points: 10

Location:
,
sound, the Great Hall of the floor pavement pavement battle officially opened! With the depth of the pavement work, pavement accuracy and parquet pattern of the overlapping problems gradually highlighted.deck staining products Floor machining accuracy is the accuracy of pavement services, but the accuracy of processing does not mean that the pavement accuracy will be able to meet the standard. Accumulated tolerance, the corridor around the corner and the corner of the irregular areas, etc., gave the protection of pavement precision brought a lot of technical problems. Construction team timely convened;cheap composite decking Zhuge Liang will, relying on the backbone of the technical capacity and old workers work experience, give full play to the enthusiasm and creativity of employees, repeated pondering, bold practice, worked out a series of fruitful measures and methods. composite fence panels 8 ft highThe first is to change the design of individual floor blocks and tolerances, pavement when the regular embedded, to achieve the cumulative effect of good tolerance. Followed by the contours of the floor processing equipment sent to Beijing, the scene of precision each set of zigzag parquet the smallest piece of processing size, a separate design, one by one processing,plastic bender board seven trest high quality to ensure the accuracy of this pattern stitching requirements. Third, in order to solve the previous figure when the edge of the edge is not straight, after the experiment to buy three screw milling machine, first open the edge of the open and trench,paul la france decks price for building both to ensure the accuracy of the pavement pattern and improve the progress of the pavement The Fourth, for the corridor around the wall and the corner of the space is small, the normal pavement tools can not display the problem,tongue and groove wall panelling south africa the timely trial out of a simple special tools to avoid the region of the floor pavement gap disease. August 13, accompanied by executive vice president of the United States on behalf of the United States on behalf of Jinqiao team nailed the last one
Posted 10 Oct 2017

Posted 03 Apr 2018

Reply to Topic