which is characterized by no baseboard, buckle, the expansion coefficient to a minimum. No base line connection, not only completely solve the water, dust problems, and will not be due to long-term use caused by the ground sink; no buckle connection, not only can be done between the floor and the floor,Can be achieved with the marble floor, tile docking. Floor and cement as a whole convergence, to avoid the floor from the arch. The whole pavement, there is no trace of splicing traces of the ground flatness natural, not contrived. Advanced technology to solve the common problems.
in the floor pavement pavement, the general problem is by the ground of sand, tide, concave, convex, crack and cause expansion, from the arch, not mute. If the ground is quiet, the ground firm, the floor will not be under the arch, the ground is not wet, the floor is not inflated,
Related links:
excise on plastic wood floor compositBuy Premade Wood Decking Gate
24 x 80 solid core floor for porch