temperature and high pressure laminate flooring

144 views 1 replies
Reply to Topic
xiao1236

Age: 2023
Total Posts: 7017
Points: 10

Location:
,
be a good 4, the installation of the baseboard fixed baseboard. The role of the baseboard is to block the floor and the wall between the ugly gap. In order to achieve a coordinated decorative effect, the baseboard can be selected according to the color of the door or the color of the floor. 5, floor, baseboard are installed, but the entire installation is not completely over. As the installation of the floor, the furniture did not come in, so the general responsibility of the construction team will remove the box, shop in the installation of the floor, that to prevent wear. Strengthen the floor acceptance skills 1, the appearance of inspection to strengthen the floor pavement, the general need to be completed within 3 working days acceptance. The first thing that needs to be checked is undoubtedly the appearance. Strengthen the floor surface should be clean, no glue, dry and wet flowers, drums, stains, cornering, cracking, scratches and other appearance quality problems. 2, the depth of inspection to strengthen the floor laying should be solid, not loose, trampled no obvious abnormal sound. By walking on the floor, judging this according to the sound. 3, flatness inspection After strengthening the floor pavement, to traditional wood vs wpc flooring
tampa komposit
outdoor flooring board price
Posted 12 Nov 2017

Posted 02 Apr 2018

Reply to Topic