Integrated opinion

215 views 1 replies
Reply to Topic
xiao1236

Age: 2023
Total Posts: 7017
Points: 10

Location:
,
have blowdown licence. Integrated opinion is as follows: 1. basis laws and regulations of environmental protection law, batch build mix differly did not Good sound-absorbing effect composite commercial stairs approve first found a capital has special condemnatory mechanism. Build a project to did not approve what build first for example, environmental protection branch can be instructed after discovery correct, manufacturing process of wood composite doors fine at the same time. The problem is amerce should do records now, at the same time fair show. Amerce does not have a problem, conduction records can handle 34 time one day only too long, at present two areas sign up for annulus to wood plastic composite brittle in sun judge formalities to need approved industry many 1300, at the same time fair notify a company

loan cannot be dealt with inside a year, original loan cannot continue. Approve in this batch of enterprises build not Mix annulus judges what because business grows,add an kerala ceiling materials item newly partly to was not approved add newly enterprise, main it is mainstay business. Proposal remit, announce on the net no longer. 2. is to do not have

Posted 22 Nov 2017

Reply to Topic