the incision surface smooth, dark color is completely cured, you can handle. Not completely cured plate can not be handled, so as to avoid the decline of adhesion. Fully cured plates need to continue to store 14 to 21 days, so that the adhesive strength can reach its installation and construction. (5) after 21 days to reach the strength, peel test can be used to test the adhesion, the test pull the end of plastic samples, with a knife in the strip incision 50mm, and then pull the incision strip back tear, If the gel is torn along the gel is qualified; the other hand, if the surface of the substrate peel, and colloidal is not damaged, then the lack of adhesion, these materials failed. Second, the installation of glass plate Glass frame Before the installation of glass and the aluminum frame around the necessary cleaning, to ensure reliable bonding caulking adhesive. Before the installation of glass coating surface should be affixed to the protective film to be protected before handing off all. 1. Glass varieties, specifications and colors should be consistent with the design requirements, if the phenomenon does not match the design drawings should be promptly reported to the relevant departments, be treated before installation. 2. The glass frame should pay
best materials to use for pool deck materialsprefab pvc deck panels in hong kongpanel dinding papan putih yang murah