wall, to the construction of intermediate plaster. Third, the light partition plate mounting member requirements 1, the top and the beam with U-shaped iron fixed, the U-shaped iron with nail fixed to the bottom of the beam, the upper end with wedge reinforcement, with L-shaped iron fixed. 2, hanging design: hanging spacing should not be less than 300m, single point load should not be greater than 80 kg, you need to open the mouth pieces. 3, electrical design: the electrical circuit can be used for dark line design, the use of partition wall holes to wear hose laying lines; also designed for bright line, apply to the wall, opening the socket and its corresponding configuration. 4, moisture-proof waterproof: decorative design should be considered moisture-proof, along the wall design pools, water tanks, basins and other accessories, the wall should be painted waterproof coating or paste waterproof decorative tile design. 5, wall decoration: scratch white, spray porcelain, ceramic tile and other decorative materials for decoration. When the next process of renovation, the first partition walls clean walls, water wetting, according to the conventional construction process decoration. In the history of the most detailed
outdoor benches with animal design plansoutside wood composite siding no crackstangga luaran komposit plastik