The role of the mat is moisture-proof, quiet. Before laying the floor, you need to pad a layer of floor mat on the ground. Generally, the laying of the mat shall be laid flat without overlapping to lay the whole floor, and the seams shall be tightly bonded with adhesive tape. Humid ground and geothermal environment should be laid under the mat moisture-proof membrane, the width of the seams should overlap 200mm or more and tape tight adhesion, the corners of the flip the same height with the baseboard.The reinforced edge of the floor is generally a tongue and groove with the latch structure, this structure is installed, just make sure that the two kinds of stitching as close as possible, without the need to use floor glue and other connecting floors. In the floor and walls need to reserve the location of the baseboard, usually with small wooden blocks in the middle. After installing the floor, you can remove the small pieces of wood, the installation of the baseboard. Baseboard is generally stuck into the reserve card slot, and then use special nail peg."
eco deck composite decking,
paneling that looks like tile,
external pvc wall panels "