of the Ate board deployment, generally not more than 600mm. 5, keel leveling: When installing the main keel, always check the elevation of the main keel in the same plane, the main keel leveling and then install the keel. 6, for manholes, ventilation parts, while installing the keel, the size of the position to stay out, the edge of the horizontal beam keel installation is completed. 7, Ete plate fixed: Ete plate should be installed before the installation of the following provisions: The first keel has been adjusted. The second vertical type lamps, fans and other equipment installed boom rod. The third ceiling within the ventilation, water, electricity pipe installation and commissioning is completed. Plates should be fixed in the state of stress-free, to prevent the phenomenon of curved ribs, Ert plate should be laid along the longitudinal keel, self-tapping screws to 150 ~ 170mm is appropriate, the screws should be perpendicular to the board, the screw head The surface is slightly buried into the board does not make the surface damage is appropriate, nails eyes for rust treatment, and then plaster putty smoothing, gypsum board should be left to install about 5mm clearance, and then put the board with putty cracks, and fill the paste
modern pvc panelsoutdoor tiles for porch philippines4 x 8 pvc board in malta