Floor put a few days

102 views 1 replies
Reply to Topic
xiao1236

Age: 2023
Total Posts: 7017
Points: 10

Location:
,
soon deform and it will not be able to transport materials when it rains. Mingwei decoration designer Luo Zengwei said that on-site production of background walls, wall molding and other wood products, processing must be completed at the scene, the normal moisture content of wood should be 10% to 12%, moisture content is too low, will lead to material cracking, Too high or wet by the rain, no problem at first sight, but the late deformation of the material will slowly occur, so in the summer to maintain moisture content of wood in the normal range, it is very important. In addition, during the summer decoration, the process of grading putty on the wall can not wait for a long time because the air in summer is wet and the interval between each process will be slightly longer than that of other seasons, but also the dry putty of each layer must be dry , So as to try to avoid the wall cracks, swelling and other issues. Floor put a few days and then shop new house Note moisture-proof dehumidification owners Mr. " High Quality Fence Panels , Composite Ready To Assemble Pool Decks "
" how to anchor round wood post to wood deck , best composite non slip stairs fence "
Posted 08 Nov 2017

Posted 02 Apr 2018

Reply to Topic