the network to return to the success of all members of the more cross-network, we only took 32 minutes, than the required time 8 minutes earlier. This project is mainly to test a team's planning, human resources allocation and reasonable division of labor,as well as mutual cooperation between teammates. In daily work, a project if one did not do well, perhaps will come to naught. When all the players were all successful at the moment of the net, we all cheered, are invariably holding the thumb, shouting our slogan.
Since then is the high V, it is a full of adventure, challenge the courage of individual courage and ability to cooperate in training activities. Two pairs of members stand separately from the ground 7 meters, composed of two wire rope V, with both hands clasped,
Related links:
Manufacturers of Rotomolded Climbing Walls install wood floor entry threshold trim pieces
composite decking or other materials to finish walls